Cement Slurry Volume Calculator
Calculate cement, water, and additive requirements for well cementing operations
Cement Job Parameters
Enter slurry requirements or calculate from annular volume
Cement Job Results
Enter parameters and click Calculate
API Cement Class Reference
| Class | Depth Range | Mix Water | Density | Yield |
|---|---|---|---|---|
| A | 0-6,000 ft | 5.2 gal/sk | 15.6 ppg | 1.18 ft3/sk |
| C | 0-6,000 ft | 6.3 gal/sk | 14.8 ppg | 1.32 ft3/sk |
| G | 0-8,000 ft | 5.0 gal/sk | 15.8 ppg | 1.15 ft3/sk |
| H | 0-8,000 ft | 4.3 gal/sk | 16.4 ppg | 1.06 ft3/sk |
Formula Reference
Slurry Yield
Yield (ft3/sk) = (94 / (SG_cement x 62.4)) + (Water gal/sk x 0.1337)
Where:
94 = Weight of one sack of cement (lb)
SG_cement = Cement specific gravity (~3.14)
62.4 = Density of water (lb/ft3)
0.1337 = Conversion factor (ft3/gal)
Number of Sacks Required
Sacks = Slurry Volume (ft3) / Yield (ft3/sk)
= Slurry Volume (bbl) x 5.615 / Yield (ft3/sk)
Slurry Density
Slurry Density (ppg) = (94 + (Water gal/sk x 8.33)) / (Yield x 7.48)
Or from components:
Density = Total Mass / Total Volume
Water/Cement Ratio
W/C Ratio = (Water gal/sk x 8.33) / 94
= Weight of water / Weight of cement
Excess Volume
Gross Volume = Net Volume x (1 + Excess%/100)
Typical excess factors:
- Cased hole: 5-10%
- Open hole (good condition): 25-50%
- Open hole (washouts): 50-100%+